saw Wee Se eere wre ee tractor personnel on the islands, Mr. McCone asserted he would not agree to the request without certain precautionary measures to protect contractorz personnei and AEC facilities at EPG. He pointed out the relative low cost of providing a vessel to remove all non~SAC personnel from the islands during the period affected by Operation Tic Tok. He further stated the advisability of conditioning approval of the request upon DOD assuming full responsibility for pessible damags to AEC property in the area, Mr, Graham pointed out the conditions under which contractor pereonne! were hired for maintenance work at Eniwetok and stressed that the proposed exercise would expose them to an entizely different type of hazarcd, He also expressed his dissatisfaction with the urgency with which the Commission was requested to make a determination in this matter, Mz, Williaras said the statistics used to determine the accuracy of the missiles were based on an inadequate sampling of similar firings and he did not favor exposing unconcerned personnel to such risks, Mr, Wilson suggested AEC contractor personne: at EPG bs offered the opportunity to leave the area during the proposed exercise, However, he did not consider the danger suificient to require their absence. - 219 -

Select target paragraph3