$.2.1~The Shkee {tevice: detonated In air over Namu, produced no contamination at The pre-entry survey, flown at approximately H+2 hr, showed the entiretoll clear and radiation levels at backgrounl. 3.2.2~The/ Zuni _{device, flred on the ground on Eninman, produced heavy contamination oughout the entire atoll, with the exception of Enyu Island. Survey results at H+4 hr are shown tn Fig. 3.1, The fact that Enyu was not contaminated was most fortunate as it allowed operations to proceed from the camp ashore tn a normal manner. 3.2.3~ The (Rrathead] device, fired on a barge.‘off Yurochi, produced heavy contamination on the northern {felanda of the atoll. survey results at ue br. In Fig. 3.2 are shown No delay in recovery operations or preparation for the next sh rienced. 3.2.4—The Dakota device was algo fired on a barge off Yurochi. H+t4 hr survey results are shown in Fig. 3.3. Contamination levela were much lo ser than expected and recovery operations were carried out as scheduled. 8.2.5<the [Navajolevies was fired on a barge off Yurochi. As with the Dakota ,fcontamfnation levels were quite low and did not Interfere with recovery opérativuns. Survey results are shown In Fig. 3.4. 3.2.6-The| TEWA reef west of Yurochl. [device was fired on a barge anchored on the Contamination wus heavy on the northern falands of the atoll. In contrast to the other barge shots, contamination was also experienced on the atoli's southwestern islands. See Fig. 3.5 for H+4 hr survey results, The heavy contamination delayed suma of the recovery operations and also the roll-up operations. Fall-out from the firing of this device contaminated Eniwetok Atoll. $3.3 On-Site Fall-out Very little fall-out was experienced on Enyu Island. On three occasions fall-out was observed and the backgrcund was Increased somewhat. Full-out continued for afproximately 12 hr, This fall-out was very lHgat, with a neak intensity of 12 mr/tr gammaradiation, Fall-out from thef_ Navajo "] device occurred approximately 18 hr after detonation, with peak gamma intensitles of 22 mr/br. -Very slight fall-out from the TEWA device approximately 18 hr after firing increased the background by approximately 4 mr/hr. Heavy rains occurred during the fali-out perlois following the firing of the (Navajo {_TEWA [and exceptionally high activity waa observed in the ralnwater, - 31 - wh from the [Zuni__lievice started approximately 28 hr after detonation and