PRIVACY ACT MATERIAL REWOVED
8,

,

(In Chere. ,

Open Station 1341 on Able.

~

| (Monitor ..... Project 13.4, 13.5.

Copter to standby for 1/2 hour.

.
.
.
veoee Project 14,
at 10,000 and 15,000 feet south of GZ,
-

-

-+

--

10.

ine.

Inspectionof condition of moors

eores Project

fiim records from Station 1341 on Able.

Recovery of

13.4 and 13.5.

The following BRAVO Boat Missions wore campleted (B42) according to the following

prioritys

|To

~

:In Charges),

coves Hecarer

calibration film and records on Nan,

reese Recovery Project 1.6 lagoon skiff

“In Charge),

20

station records.

36

, ~~ eee

(Monitor),

Survey Trailer.

Nan by DUKW and LOM #20h.

ICM #37.

(In Charge), ecooe Project 2,5a. By LOM#49 to Tare, Recovery
2.5a packaging and handling materials from Tare Compound (Burned!).
-

(In Charge),

cocee Project 2.2.

Prepare trailer at Tare

Compound for LS? shipment (it burned out’),
.

;

;

4

~§e

seese Project 2.5b, Recovery, packagin

end handling materials from fars Compound and storage (burned!),
materials stored on helicopter barge.

Reocvered

(450) ...-. Inspection and monitoring of mooring equipment for shot barge
_- (ABS Security) ..... Discharge of security responsibilities ‘in cone
nection with Tare Exclusion Areas,

“Wonitor) ee... Inspect and secure Station 50 on Tare.
4s a result of Rad-Safe Surveys listed below are the radiation readings for B/2;

Time
0925

0925
0925
1000
1000

Copier,

.

Nan

Nan
Nan
George

Ground

Sta 70.

eR

75!

.- Copter Strip
North Ena
Smith Station’

George

George
Ceorge
Dog

1000

Charlis

1015
1030

Position

00

o*
50?
50°

2,000:
1,000
3,000

50°

2,000.

(According to Felt 50' or less 7,000 LR/ER)

1000
1000
loco
1000

F Lay pao0e

Isiand

Distance
Above

Dog-Charlie

Baker
Bravo
-

Sta lol

Reef Off George
50°
Reef Between George-Fox 50°
ose
50°

100
2,000.
10, 00a

Reef between Dog-Charlie 250°

Station - Colgate

wanee
wees

2-

meets

a

200

50°

,

6000 to 8,000.

50°
50°

25,000
100.

-

|

7d

oe

a4

Select target paragraph3