{>

hea

we
.
«

_._ PRIVACYAGTHIARERHALREMOVED
ProwTet

TOE
DEPART

PEGE LE_ Wel VED

1126

0955

Tu-13
TU-8
1.2b

yor
ROTURE

-

DECTIMATION.- ~
and

Go to

spend 15 rinutes on ground thenct

to {ble and Charlie, let Christer
. spend up to 15 minuts
_
and
at each of Able and Charlie in

Stas. 1341 and 1200, to be picket

b: signals arranged with pilot.
to ride co-pilot seat.
Copter to circle stracture each
pu
tine before landing for phogo
al
aeri
along for
posese

inspection of 1.2 Charlie Stat

1002

_

222000
13

minut
te ay 15 mimtes, Ode, 15 te
How 30 minutes.
eo

CANCELLED,

TU-15
each way.
TG 7.3

145
(Refuel)
38

cep oe
-

Et wee
oe
.

ASS
;

1240.

1325

USS CURTISS channel Survey.

1055

1159

ng
Water sarpling mission, droppi

.

TU-12
TG 7.2

To How - 30 minutes, te George -1

minutes, film recoveryze —

off at Nan for pick up

of equipment, then to Tare to

drop off

and

to return on copter
_ to return

mission £10,

.

by boat.

17

J-3

‘& a

-12

1,50

1600

)

urne
fo Charlie, Sta. 1200 and ret
ch
whi
#11
n
sio
Fie
Completion of
one
in
hed
lis
omp
acc
could not be
nissione

2

1730-1800

-2-°
we eee

8

gee
and 50f

TG 7.3

TU-8
TU-13

ae

.

2

Pict up from Tare and return 2 ner

to EAIROKO.

Select target paragraph3