.
oa
5m bie
34
CONFIDENTIAL 3. sii 4
4
ds
ib.
FINAL RADIOLOGICAL SAFETY REPORT
1, Efficiency and performance of water washiown system was
highly satisfactory, The use cf plastic piping and fire nose
linkage led to setting up of system in rinimm mort cf tinas
% Least 98% of ship was effectively washed dewn by present
systame
Ae Efficency of radiac eq-ipment was excellent, Personne.
were Satisfactorily trained for this operation, No operation:
difficuities were encomtazed concerning radiac cortzuent.
3e
No opportunities arose as to necessitate w39 of dacontmiration
materialse
4, Radiological safety training for the operation was considered
Satisfactory, A large percent of crew attendel ABC and Rzdl-afe
schocls beforc icparting OONIS for operation, Several shipbvard
lect:ros woia -iven entoute EPG. The shipboard lecture ani
demonstration .ivoa by 7.3 Radlsafe toam was of extrome valde
BEST AVAILABLE COPY
tS be ePRULE De
ENCLOSURE (2)
oo 4