TARE tower (light only).

{f)

HRS landing (TARE strip only).

Ships Responsibilities,

(a)

{b)

USS ESTES AGC-12
2.

Airdrome control,

e

ho

(4)

(e)

Seadrome control,

3.

Loading list (manifest),

4.

Coordinate boats and HRS,

5.

Aircraft control and communications facilities.

6.

Approach control,

7.

House rescue crew (fire crash crew).

USS BAIROKO,
1.

HRS control (except TAN” strin).

——

2e

Coordinate with EST5S,

2h

3.

Altcrnate for ESTrs,

~

b. Airlift Control Operations: It was ayreed that Task Group
7.4 would control all airlift operations in the Pikini area, It was

further egreed thet Task Group 7.4 would have full tower control resron-

sibility, including thet over Task Group 7.3 heliconters at both TAVS
strip and the water linding area. The attached letter of recporsibi ities
(Atchmt #1) outlines agreements on detailed control. wrote ures.

c. Water ‘anding Problems: The attached letter (Atehmt fA) vos
discussed and agreements vere reached as outlined in first inforses rn,

{Atchnt #2) thereto.
d.

Aireraft
(1)

~

Scheduling, Svace Allocation aud (anilestLgr:

It was screed that ihe Pollowdies atrial sc thedetoe
vould be flown by Tesk Group 7.4, stoge* Tl atten
avaihabllaity:

(a)

Daily C-47 or PEM onsrations from Tal) surap to L

employed whenever TAs ate: ar apont

DEPT
Resvlar Pit
Rerulor Plt

FREL

TARE

ARR

DEPT

fA.

rr.

2he

100°
1500

1139
1620

tbeDOD
LO4L5=L769

Be DB
1515-7530
Ths

'ea D

Select target paragraph3