PAGE 2 RHWNEAAGO52 UNCLAS
PHASE 4 SAMPLING SOILS GN NORTHERN HALF OF YVONNE BEGINS WITH
ENDOCTRIWNATION AND TRAINING. ON 31 JANUARY PRACTICE SuIT UP
WITH BACKHOE GPERATOR. PHOTOS TAKEN OF THESE PRACTICE OPERATIONS
WITH A MOCK UP OF DIGGING A PIT ON FRED, TwO BACKHOE OPERATORS
AND TwO BACKHOES AARE AVAILABLE FROM SaMTEC,
THE RADIO OPERATOR/TECH. LEFT ON THE MAC FLIGHT THE aFTERNOON
OF 31 JANUARY. COMMUNICATIONS SYSTEMS, BOTH THE PRIMARY aNd
BACKUP, WENT QUT ON THE MORWING OF 1 FEBRUARY. WE HAVE Kad
ONLY THE HAM AND SATELLITE SYSTEMS OPERATIONAL SINCE THAT TIME,
ON 1 FEBRUARY THE TEAMS STAKED OUT THE ARRAY FOR A I@* X 18°
FIDDLER SURVEY FOR HOT SPOTS IN THE QUINCE AREA TO EXTEND aBOuT
602° EACH SIDE OF QUINCE GZ.
ON 2 FEBRUARY THE FIDOLER SURVEY WAS CONDUCTED. THE SOIL SAMPLES
AT EACH OF THE TwO TLD LOCATIONS ON SOUTH YVONNE WERE COLLECTED.
ON 3 FEBRUARY THE TEAM LOCATED AND MARKED THE SOIL PIT LOCATIONS
STARTING JUST WORTH OF THE BUNKER/TOWER AND EXTENDING THROUGH
THE QUINCE GZ AREA.
ON 4 FEBRUARY THE TEAM CONSTRUCTED THE DECON SHOWER FACILITY @ND
THE HOT LINE THAT IS TO CONTROL ENTRY AND EXIT FROM NORTH YVONNE,
TwO ADDITIONAL H P°S ARRIVED THIS DATE, LYNCH AND MYERS, PLUS THE

Select target paragraph3