656730 oe "326: : + : HOIMES. & Naar, Ne, -Bagineere . _ BECLASSIFIED PER DOE so ‘ Constructors | - +AE=(29=2)-20 Keatnsct:He . LETTER DATED JULY, -Br. 199 m BO. 98, Reve3 “Typed: March13,39 ay“Confident daa.Tettars 4-1/000.93 ‘dated QL1~57, ant57,.“a ‘\e30e57and’WeQbe571may be seen. in Project Ingineer.Fils Copies of sanewill be transmitted to,Jobsite, ©~oe .LatterBTEFWH 343 dated 2-26-57 (HAN 36228), “ 2 Dehetre. Holmer, to.‘Sanders dated a-2T~574 *. ne"enastationtetobeabeliantotheone logatel an Wotio,. all in — with. reference confidential“letter (4)dated February 11, 1957, and as modifiedby ‘referenceletter (B)e‘correctedvith Teterence Teletype Cc). | Reference letter: (B) ius quoted|as “follows: * “You are hereby authorized to design end prepare estimates for Weather and Rad-Safe Stations as requested in JIF-7 letter dated February 11, 1957. ; "Estimates should be prepared for each single location for both the new stations and the rehabilitation of existing stations as funding for this project has not — been definitely determined, "During recent meetings in Washington | various suggestions in regard to design were offered as follows: 2. Tanks for potable water are to be fabricated of non-corrosive material, The plan for the four new weather stations is to be based on the Tarawa, pian, with minor exceptions, namely: Be Move antennas so that not more than 150! of drop-lead to the Operations Building No. 5 is neceseary, af required, 8 OF The antenna can be directly over the building . US Mess 1, ONLY + E,0. 98, Rev. 3 ata

Select target paragraph3