656730 oe
"326:
: +
: HOIMES. & Naar, Ne,
-Bagineere
. _ BECLASSIFIED PER DOE
so
‘
Constructors | -
+AE=(29=2)-20
Keatnsct:He
. LETTER DATED JULY, -Br. 199
m
BO. 98, Reve3
“Typed: March13,39
ay“Confident
daa.Tettars 4-1/000.93 ‘dated QL1~57, ant57,.“a
‘\e30e57and’WeQbe571may be seen. in Project Ingineer.Fils
Copies of sanewill be transmitted to,Jobsite, ©~oe
.LatterBTEFWH 343 dated 2-26-57 (HAN 36228),
“
2 Dehetre.
Holmer, to.‘Sanders dated a-2T~574
*.
ne"enastationtetobeabeliantotheone logatel an Wotio,. all in
—
with. reference confidential“letter (4)dated February 11, 1957, and as modifiedby
‘referenceletter (B)e‘correctedvith Teterence Teletype Cc).
| Reference letter: (B) ius quoted|as “follows: *
“You are hereby authorized to design end prepare estimates for Weather and Rad-Safe
Stations as requested in JIF-7 letter dated February 11, 1957.
;
"Estimates should be prepared for each single location for both the new stations
and the rehabilitation of existing stations as funding for this project has not —
been definitely determined,
"During recent meetings in Washington | various suggestions in regard to design were
offered as follows:
2.
Tanks for potable water are to be fabricated of non-corrosive material,
The plan for the four new weather stations is to be based on the Tarawa, pian,
with minor exceptions, namely:
Be
Move antennas so that not more than 150! of drop-lead to the Operations
Building No. 5 is neceseary,