PRIORITY
TEN2

MSG909

PAGE 02

295

2158

(TOTAL OF 3 SYSTEMS IN LAB).
- ADD 1 MORE GAMMA COUNTING SYSTEM (USE IMP SPARE SYSTEM).
EIGHTEEN MONTHS OF OPERATION - ASSUME Lag ROLLUP APR 80.
TOTAL PRODUCTION = 11200 SAMPLES.
INCREASE IN LAB SUPPLIES.
INCREASE BALL MIL CAPACITY IN PREP LABe
FOR THE 14 ISLANDS LISTED IN REFERENCED TwXe A 50 METER GRID
YIELDS 1053 LOCATIONS (FOR INFORMATION NV-140 LISTS 76 PROFILE
PAGE 3 RUHHDNA0501 UNCLAS
LOCATIONS FOR THESE 14 ISLANDS)+ REF TWX SPECIFIES PROFILE SAMPLING
ONLY AND WITH 6 INCREMENTS PER PROFILE EQUALLING 6318 TOTAL SAMPLES.
COMPARE THESE NUMBERS TO POSSIBLE PRODUCTION RATES RAISES THE FOL
LOWING QUESOIONS:
1. WHAT PROFILE LOCATION DENSITY IS ACCEPTABLE? (IS A GRID ACCEPT—ABLE?)
2. WHAT TRADE OFFS CAN BE MADE TO REDUCE SAMPLE LOAD (E.G. REDUCE
NO, OF ISLANDSr N. OF CHEMICAL ANALYSIS REQUIRED PER PROFILE)?
3. con INCREASED MANPOWER BE PROVIDED IN TIMELY MANNER (I1.EALT
2)?
4%. IS IT REASONALBE TO ASSUME LAB OPERATIONS UNTIL 1980?
Se ARE ALL ORGANIZATIONS INVOLVED IN THE CLEANUP WILLING TO COMMIT
THEMSELVES TO THIS NEW TASK?
OTHER QUESTIONS RELATING ARE:
1. A METHOD IS NEEDED TO INTEGRATE OVER THE 10+ 15 AND 20 CM INCREMENTS SPECIFIED IN THE PROFILE? SOME OPTIONS - USE EXISTING ON@ISLAND EQUIPMENT AND TAKE A 5 CM (10 CM wIDEr 10 CM LONG) THICK
SECTION FROM THE MIDDLE (TOP OR BOTTOM) OF THE LAST 3 LARGE IN@PAGE 4 RUHHDNAOS501 UNCLAS
CREMENTS AND INTEGRATE OVER THE PROFILE MATHEMATICALLY OR DEVISE
A METHOD OF SAMPLING THE INCREMENT INTACT WHICH INTEGRATES OVER
THE ENT@RE INCREMENT MECHANICALLY.
2.e SHOULD CONSIDER SURFACE MEASUREMENT WORK OF IMP AND RELATED LAB
WORK AS ESTIMATE OF SURFACE ACTIVITY FOR CS"137+ AM"241 AND PU239+ 240. COVERAGE IS BETTER THEREFORESTATISTICS OFR ACTIVITY
DISTRIBUTION WOULD BE BETTER = PRELIMINARY WORK HERE INVESTIGA=
TING THE CORRELATION BEOWEEN VAIOUS ISOTOPES AND SR-90 FROM
NVO"-140 DATA SUGGESTS THIS METHOD MIGHT RE USED TO FILL IN DATA
GAPS+ PARTICULARLY FOR SURFACE INFORMATION.
FINALLY = IT IS NECESSARY TO SCOPE THE«SIZE OF THE OVERALL TASK AS
ILLUSTRATED ABOVE SO THAT SUFFICIENT PLANNING CAN BE MADE TO FIT IT