SUPPORT JOHNSTON ATOLL 02006 Page 2 A 100 kw no-break (uninterrupted power supply, UPS) power unit on the first floor provides 120/208 volt, 60 cycle, 3 phase power for Users that demand UPS power for their projects. A second 100 kw no-break power unit (UPS) operating in parallel with the existing unit will be utilized primarily by the Subtask A909 Computer Facility. An Optical Station (refer to F&S Number 01072) and numerous antennas are located on the roof of the JOC. Equipment handbooks have been prepared that describe in detail the operational capabilities of all utility and equipment systems in the JOC. DRAWINGS: 91-20-Al thru A27 91-20-Cl and C2 91-20-S1 thru $14 91-20-Ml1 thru M38 91-20-El1 thru E24 91-20-E26 thru E36 91-20-AA1 thru AA5 91-20-Wi thru W10 91-030-W8 91-030-W1l1 thru W19 91-030-W20 and W25 91 SK-01-Sheets 1 thru 5 JS SK-20-A103 JS SK-20-S119 JS SK-20-M116 and M117 JS JS JS JS JS JS JS JS JS JS JS JS JS JS JS SK-20-E107 and E12) thru E126 SK-20-E131 thru E133 SK-20-W105 thru W107 91-20-A100 and AlOl 91-20-A104 thru All? 91-20-5100 thru $110 91-20-S114 and S115 91-20-M100 and M102 thru M104 91-20-E100 and E102 thru E104 91-20-E107 and £108 91-20-E111 thru E113 91-20-E115, E118 and E119 91-20-El22 and E123 91-20-AA100 thru AA103 91-20-W101 thru W119 POST -GO PROCUREMENT Additional furniture will be procured. 2-7 VOL I