JOHNSTON ATOLL
SCIENTIFIC
F &S NO.
01012
TITLE Rocket Launch Control & Monitoring Bunker - Subtasks A108,
A109, A201, A202, A203, A601, A602, A603, A604, A606, A6l3,
A614, A620, A901, AI05, AI09, AI1L5 and A962
USER
STRUCTURE FACILITY NO.
IJTF~8&
TC
FUNDING
AGENCY
JTF-8
MILCON
CRO 7-64
CRO 7-65
SCIENTIFIC STATION NO.
881
91-3-1 and 91-3-18
($000)
ENGR
PRE-GO
Prior Cost
POST-GO
Est. 5/65
TOTAL
PROC
45.2
CONST
TOTAL
560.0
605.2
aK
45.2
560.0
BOD GO+90
FOD GO+9 0%
FURN
1.0
605.2
1.0
COMPLETED
DESCRIPTION This facility (completed in 1966) comprises two 54x 72 x 13-ft.
high reinforced concrete, air conditioned, dehumidified bunkers separated by
a 28x 72x 13-ft. high common mechanical equipment area. Both bunkers have
raised floors, suspended ceilings, and latrine facilities. The easterly bunker
will be utilized by Subtasks A905 and A909 for rocket launch control. The west-~erly bunker will be used by Subtasks A108, A109, A201, A202, A203, A6dl,
A602, A603, A604, A606, A613, A6l4, A620, AIO1, A915 and A962 for rocket
payload monitoring.
The bunkers are designed to withstand overpressures of
6 psi on the sides and 3 psi on the roof.
A 500 kva, 4160-480Y/277 volt, 3
phase transformer ''Tl" provides power for scientific facilities and a similar
transformer ''T2" provides power for utility purposes. These two transformers
may be tied together on the secondary side, if required, through a normally
open circuit breaker. An additional transformer on the secondary side provides
120/208 volt, 3 phase power where required. Lighting is RF shielded and provides 75-ft. candles at bench level. Transformer 'T2" also provides 45 kva of
480 volt secondary power to Building 868. The existing electrical system provides 200 amps of 28 volt D.C. power; however, the D.C. distribution panel
and circuitry will not be installed until firm criteria for this power is established.
DRAWINGS:
91-881-Al thru A4
91-881-Cl
91-881-Si thru SILO
91-881-M1l thru M11
91-881-El thru E7
JS 91~88i1-~A100 and Al
JS SK 881-~M100
JS 91-881-E100 and wil
* The FOD for the Launch Control Bunker is GO+90, while that for the Monitoring
Bunker is GO+135.
#2Post-GO requirements, not estimated above; will include contractor support,
for installation of TC furnished equipment and scientific cabling.
TNT
OT
1-12