JOHNSTON ATOLL
F&S NO.
81020
USER
PROGRAM 437
TITLE
Payload Assembly Building
STRUCTURE,FACILITY NO.
ADC
SCIENTIFIC STATION NO.
795
BOD
None
FoD
FUNDING
AGENCY
ADC
($000)
PRE-GO
Prior Cost
TOTAL
ENGR
PROC
CONST
TOTAL
FURN
28.0
239.0
267.0
28.0
239.0
267.0
COMPLETED
DESCRIPTION The Payload Assembly Building is located within the ADC secured
area on the north central part of Johnston Island and just north of the Launch
Operations Building 790. The dimensions of the building are 40 x 71-ft. A 24x
42-ft. mezzanine is included within the structure. The walls of the building are
concrete block; the roof is ''composition" over insulation and metal decking; the
floors, including the mezzanine, are concrete.
The building houses technical
areas and provides space for parts storage, guardroom, mechanical equipment,
and has a latrine on the first floor.
The mezzanine has space for a laboratory,
latrine and offices.
The high bay area is approximately 23-ft. high andcontainsa
5-ton hoist with a 15-ft. hook height.
DRAWINGS:
The building is air conditioned.
91-795-Cl
91+795-Al thru A5
91-795-S1 and S2
91-795-SS1 and S5S2
91-795-Ml1 thru M4
91~-795-El thru E3
91-795-SE l and SE 2
91-795-W1 thru W4
JS 91-795-5100 and $101
81-22
sn ad ' ’
VOL I
April 1969