JOHNSTON ATOLL
F&SNO.
TITLE
80002
Mix Fill Building
USER
STRUCTURE/FACILITY NO.
DTC
PROJECT SHARP NAIL
BOD
SCIENTIFIC STATION NO.
950
None
FOO
FUNDING
AGENCY
DTC
($000)
ENGR
PROC
CONST
TOTAL
PRE-GO
Prior Cost
19.9
145.7
*165.6
TOTAL
19.9
145.7
165.6
FURN
4
COMPLETED
DESCRIPTION Building 950 is presently unoccupied; however, the DTC modified
and occupied the building during their stay on J. A. in 1965. It is planned to move
the structure to make space for Decon Pad No. 2 (see F&S No. 02069).
The building is a 20 x 40 x 8-ft. high wood framed structure with a concrete slab,
plywood siding, and a plywood roof with composition roofing. The building is
positioned on a 100 x 100-ft. stabilized area which is enclosed by a security fence.
A reefer van is built into the west side of the building.
An air conditioning and breathing air system is installed in the building. Power
is provided by a 60 kw diesel generator with a duplicate unit provided as backup.
Freshwater is pumped into the building from an adjacent 10,000 gallon storage
tank. Saltwater is provided from the island distribution system. Sewage is piped
into a septic tank and chemical wastes drain into a waste tank; both sewage and
chemical effluents are then piped into the ocean. A boiler, feedwater unit, two
sterilizing units and an air compressor for the breathing air system are located
adjacent to the building on an 18 x 25-ft. concrete pad.
DRAWINGS:
91-950-Cl and C2
91-950-Al
91-950-M1 thru M3
91-950-E1, E3 and E4
JS 91-950-E100
JS 91-950-W100
“Includes cost for F&S No. 80004.