COMMUNICATIONS
JOHNSTON ATOLL
F&S NO.
04020
USER
TITLE
|:EG&G Signal Cable
“STRUCTURE FACILITY NO.
EG&G
FUNDING
FUNDINE
AEC
Financial
Plan
SCIENTIFIC STATION NO.
None
($000)
BoD
None
ENGR
PROC
GO+30
CONST
TOTAL
FOO GO+30
FURN
PRE-GO
Prior Cost
2.8
111.6
1i4.4
FY-69
POST-GO
3.0
37.0
40.0
39.7
39.7
TOTAL
5.8
188.3
194.1
Estimate 5/65
PRIOR YEARS
ENGINEERING
Drawings:
Completed.
91-079-W87 thru W90, W96
PROCUREMENT All signal cable has been procured and is located at Johnston
CONSTRUCTION Signal cable has been installed in the trough system from the
JOC to constructed facilities which require timing and firing services.
FY -69
ENGINEERING
Completed,
Drawing:
91-079-W97
PROCURBMENT Completed.
CONSTRUCTION Preparations are being made for installation of T&F signal
cable in the cable trough system in anticipation of Exercise LAPWING as
follows:
(1)
100 Pair Signal Cable
(1)
75 Pair Signal Cable
(1)
12 Pair Audio Cable
(2)
12 Pair Audio Cable
VOLI
April 1969
FROM
Bldg. 20, Room 430
Bldg. 20, Room 430
TO
Bldg. 16, TB-3
Bidg. 16, TB-3
16, TB-3
Bldg. 93, TB-3.1&
Bldg. 16, TB-3
Bidg. 93, TB-3.1&
Bldg.
TB-3A.1
TB-3A. 1
Fe naethy annals
Island.