‘qn
JOHNSTON ATOLL
SUPPORT
F&SNO.
TITLE
0302A
Mess Hall
USER
STRUCTURE. FACILITY NO.
JTE
FUNDING
AGENCY
AEC
SCIENTIFIC STATION NO.
519
sop
None
($000)
ENGR
PROC
CONST
FOD
TOTAL
FURN
PRE-GO
Prior Cost
TOTAL
23.2
306.0
329.2
23.2
306.0
329.2
COMPLETED
DESCRIPTION The Mess Hall originally completed prior to 1963, is a 113 x 152
x 10-ft. high wood framed, plywood sided building with a concrete floor and builtup roofing. The existing facility was expanded in 1964 to provide a 1000 man seating capacity. Other facilities located in the building include a kitchen, bakery,
dishwashing room, boiler room, latrine and other associated mesSing areas.
DRAWINGS:
91-519-Cl
91-519-Al thru A8
91-519-S1 thru S4
91-519-Ml1 thru M5
91-519-El1 thru E7
JS SK-519-Al105
JS SK-519-M103
JS SK-519-M115 and M116
3-9
i
JS
JS
JS
JS
JS
JS
JS
JS
91-519-C101
91-519-A101 thru A105
91-519-S100, $103 thru S105
91-519-M100, M107 thru M109
91-510-Ml11ll thru M114
91-519-E100, £104 and E105
91-519-E107 thru E109, Elli
SK-519-E102 and E103
VOLI