\ serneerTr |
JOHNSTON ATOLL
SUPPORT
F&SNO.
TITLE
02078
Administration and Operations Building
USER
STRUCTURE “FACILITY NO.
TG 8.3
SCIENTIFIC STATION NO.
None
BoD
None
FOD
FUNDING
AGENCY
($000)
ENGR
PROC
POST -GO
AEC
Est. 3/69
TOTAL
CONST
TOTAL
139.0
139.0
139.0
139.0
FURN
POST -GO
ENGINEERING
To be initiated upon approval and availability of funds.
PROCUREMENT
To be initiated upon availability of funds.
CONSTRUCTION
This building will be located south of Warehousing Building
287.
A 40x 120 x 14-ft. high steel frame structure with corrugated asbestos
cement roof and siding will be constructed. The concrete floor will conform
to normal office standards except for a 4000 pound wheel load capacity requirement in the maintenance area. The maintenance shop will be a 30 x 40-ft. area
located at the west end of the building and separated from the rest of the building by a full height partition wall. The west wall of this area will have a 10x
10-ft. sliding door, and also one personnel door with lock and panic hardware.
Three 10 x 10-ft. rooms and six 21/2 x 6 x 3-ft. high workbenches will be
provided.
The remainder of the building will be divided into office spaces and
latrine facilities. All areas, except the maintenance shop will be fully insulated
and will have 10-ft. high suspended ceilings and gypsum board walls. The interior of the building will be illuminated to an intensity of 40-ft. candles.
VOLI
April 1969
2-72
Corer