ScreNTIFIC STATION NO.
sop GO+120
one
pac
FUNDING
AGENCY.
($000)
ITF-8
.
—
PRE-GO
RDT&E
| Prior Cost
4101-61
Est. 7/65
EAO 1106-| POST-GO
MILCON
CRO7-64
SUBTOTAL
AEC
PRE-GO
.
ENGR
PROC
3.4
—
.
1.0
TOTAL
4.4
TOTAL
11.3
. 142.7
21.6
3.4
FY 69
CONST
32.9
21.6
.
4.0
FooGO+1 208.
FURN
__
36. 3
“
36.9
§.0
ae!
41.3
PRIOR YEARS
ENGINEERING Completed. —
Drawings:
91-058-C1
.
91-058-El
PROCUREMENT Completed.
a
91-058-AE1
«
CONSTRUCTION A primaryfeeder systemwas installedin 1966 to serve the
trailer park,
FY¥ 69
ENGINEERING Completeds *.
Drawing:
PROCUREM
CONSTRUC#™ a ee
; furnished technical trailers will each be provided
with 60 amps 6&
268, 60 cycle, 3 phase power.
POST -GO
PROCUREMENT
To be accomplished.
CONSTRUCTION A compacted and fenced area of approximately 36,400 square
feet will be provided adjacent to the east side of the JOC. It will provide secure
parking for the following trailers:
2-43
VOLI