SET
JOHNSTON ATOLL
SUPPORT
F &S NO.
TITLE
02036
Waterfront Facilities
USER
STRUCTURE/FACILITY NO.
JTF
SCIENTIFIC STATION NO.
See Text
Bop
None
FOD
FUNDING
AGENCY
($000)
DPWO
ENGR
PROC
CONST
TOTAL
FURN
PRE-GO
CONTRACT
NBY 54833
Prior Cost
1,380.5
TOTAL
1,380.5
COMPLETED
DESCRIPTION Improvements to Waterfront Facilities were completed in 1965,
under contract NBY 54833, andincludethe following:
a.
Transformer Building An 18 x 24-ft. masonry building (Building 128)
was constructed adjacent to the shop building (Building 127). This
building houses a 50 kw motor generator set, a 150 kva transformer,
and electrical controls and panels.
New Pier A wooden pier, providing 360-ft. of new frontage was constructed on concrete piles just west of the existing small boat piers.
The pier is equipped with floodlighting, rubber bumpers, diesel and
freshwater lines,
railings, and two walkways to the island.
Dolphins Twenty-one (21) timber pile dolphins were located in the
Johnston Island wharf area.
Fender Systems
Rubber and wood fender systems were installed on
bulkheads 1 and 2 on Johnston Island, bulkhead 3 on Akau Island and
bulkhead 4 on Hikina Island.
CITG 8.6 Quarters
Sheet pile bulkhead was constructed on the north
and west sides of the area occupied by the CJTG 8. 6 Quarters (Building 1) on Johnston Island. The new piling was tied into the original
piling. A wooden pier, 20-ft. long was constructed at the face of the
piling on the west side.
Small Boat Piers Wooden piers about 100-ft. long and 7-ft. wide were
provided on Akau and Hikina Islands. Both piers were equipped with
four 3 pile wood dclphins.
Channel Markers Permanent channel markers were placed in the
Johnston Atoll area channels.
7
VOLI