JOHNSTON ATOLL F &S NO. 02013 USER _SUPPORT TITLE Roadwork and Site Grading STRUCTURE /FACILITY NO. JTF SCIENTIFIC STATION NO. None Bop None FOD FUNDING AGENCY AEC ($000) ENGR MILCON CRO2-65 CRO 2-66 CONST TOTAL FURN PRE-GO Prior Cost |STF-8 PROC 63.6 PRE-GO Prior Cost 417.5 481i} 86.0 86.0 503.5 567.1 CRO4-66 TOTAL 63.6 COMPLETED DESCRIPTION The basic road system (completed in 1965) consists of a 20-ft. wide paved roadway which follows the periphery of the island and permits access to the major facilities. This road system includes Mitchell Avenue, Arnold Avenue, Kelly Avenue and Tinker Drive and connects with the ADC road network Drainage ditches, catch basins, culverts, and flap gates necessary to handle the island storm water runoff are provided. Sidewalks (completed in 1966) are provided for Arnold Avenue and Mitchell Avenue, DRAWINGS: VOLI April 1969 91-075-Cl thru C36 91-075-C40 and C41 2-16 JS 91-075-C107 thru Cli2 JS-SK-F-094-C 100