Cleanup involves the removal of vegetative overgrovth, “debris, structure

: and other materials residual from the,“use of,the.Atoli for atomic.testing 8
which could pose radiation or accident hazards to the populationor inter=

i fere with their reasonable use of the land.” ee

3.

oe

|

The DOD will manage the cleanup, utilizing the Defense Atomic *

x oy

DATE
K LTR OW,A,Sense shee %
bo € 9A-jas
S3h- 70
Lee P3928
Pee 7

i

its existing organizational relationships with the AEC and AEC contractor:

REVIEWED BY

s Gupport.. The JCS have designated the Director,DASAto act as Project
sage,

oe Bae

feed gi @ “Re

Manager and have provided him appropriate “Anstructions, © ‘the project ‘willZ fe

provide a unique opportunity for exercising the readiness capability of #°"
%

L Keb &10-22

BYAUTHORITY OF DOB’ OG

CLASSIFICATION CANCELEn

Support Agency (DASA) including the Joint Task Force EIGHT CITF-8) and

S yrr-s in. planning and organizing the deployment of men and equipment to pe *s

undeveloped islands on short notice, at minimum demand upon outside
redources, in manner sinilar ts that which would be required ih support
of the treaty safeguards if niiclear testing were ordered resumed in the

environments prohibited by the Limited Test Ban Treaty:

Select target paragraph3