HOLMES @ NARVER,

INC

ENGINEERS - CONSTRUCTORS
JOB 942

NAME OF STATION

OF

TRIANGULATION

GAIL

CHIEF OF, PARTY .H. mM. Johnson
DESCRIBEO BYW. Creasman MARKED Hy

Do

.

Gail

‘Elgin
| Buck #1

DETAILED

Pacific Southwest

4.52

00-00-00
|
32427-24

a
—_——
8.15.

|

|

/

3

32-27~24

DESCRIPTION

4.52

OF

9,23

Bd

STATION

.

This station was established as a second order triangulation station in the

Atoll Control Net by the Holmes & Narver 1957 Replacement Survey to replace
triangulation Station GENE which was destroyed during Operation Redwing.

This station is located approximately at the center of the &sland and 125 feet

from the lagoon high tide line.

The station mark is a standard H & N brass cap set in a conorete filled 55
gallon drum encasing the top of a 10" H-pile.

1957."

It is stamped "Gail - H & N -

The mark is 6" below the ground surface.

This station is the western end of the "Gene-Helen-Irene" first order traverse.

Bucks #1 and #2 are 4"x4" posts set in concrete with a punched aluminum strip

fastened to the top.

The Strips are stamped with the buck number.
PRUNES EY BIRD BO
R
oT

fy
ah

wide

J 4

|

a

Oo

OF MARK.

Teiteiripucchi Island
Eniwetok Atoll

TO REFERENCE MARKS
DIRECTION
1 ELEVATION

ae

ELEVAT!ON

he National Arch
Reproduced fro m.the holdings of tt ion
Reg

SH Nae

ms,
>

| 328.07

Gene

Marshall Islands

5/14/57

> METERS ~

to

—164.04 |

Burk #2

de.

,

H.M.Jd.

DISTANCES AND DIRECTICNS
UBJECT
i
OISTANCE
;

‘FEET

|

DATE

PAGE.

FIELO SOOK NO

SITE

STATION

eee oltl
‘

DESCRIPTION

Select target paragraph3