SECTION19 PLUMBING 19-01. SCOPE OF THE WORK: Under this section of the specifications and the accompanying drawings the Contractor shall furnish all labor, materials, equipment, tools and transportation required to complete 911 plumbing work indicated on the drawings and as hereinsefter called for. This work shall consist of all sanitary drainage, vents, floor and shower drains, floor sinks, plumbing fixtures, water heaters, pumps, all piping, valves, and fittings, pipe covering, and all other miscellaneous items of material and labor as may be required for the proper operation and maintenance of the systems. 19-02. APPLICABLH SPECIFICATIONS: The following specifica- tions form a part of this specification: a. Federal Specifications; HH-C-536 COMPOUND: HH-G-116 GASKETS: PLUMBING-FPIXTURU-SETTING HH-P-117 PACKING: JUTE, TYISTED QQ-L-156 LEAD: Q-S=-571b SOLDER: silver) PLUMBING-FIXTURE-SETTING CAULKING SOFT (tin, tin-lead, and lead- "MW-N-351 WIPPLES, PIPZ: BRASS, STEEL AND WROUGHT IRON WW-P-351 PIPE: BRASS, SEAMLESS: IRON-PIPESITE, STANDARD AND EXTRA-STRONG Whl-P-4O1l PIPE A‘D PIPE FITTINGS: IRON WW-P-406 PIPE: STEEL AND FERROUS ALLOY (for) ORDINARY USES (IRON-PIPE-SIZE) WWw-P-).60 PIPE PITTINGS: and 250 pound, Yi¥-P-9Qla PIPE FITTINGS: 19-1 SOIL, CAST- BRONZE (Screwed), 125CAST-IRON, DRAINAGE