SECTION19
PLUMBING
19-01.
SCOPE OF THE WORK: Under this section of the specifications and the accompanying drawings the Contractor shall
furnish all labor, materials, equipment, tools and transportation required to complete 911 plumbing work indicated on the
drawings and as hereinsefter called for.
This work shall consist of all sanitary drainage, vents, floor and shower drains,
floor sinks, plumbing fixtures, water heaters, pumps, all
piping, valves, and fittings, pipe covering, and all other
miscellaneous items of material and labor as may be required
for the proper operation and maintenance of the systems.

19-02.

APPLICABLH SPECIFICATIONS:

The following specifica-

tions form a part of this specification:

a.

Federal Specifications;

HH-C-536

COMPOUND:

HH-G-116

GASKETS:

PLUMBING-FPIXTURU-SETTING

HH-P-117

PACKING:

JUTE, TYISTED

QQ-L-156

LEAD:

Q-S=-571b SOLDER:
silver)

PLUMBING-FIXTURE-SETTING

CAULKING
SOFT (tin, tin-lead, and lead-

"MW-N-351 WIPPLES, PIPZ: BRASS, STEEL AND WROUGHT
IRON
WW-P-351

PIPE: BRASS, SEAMLESS: IRON-PIPESITE, STANDARD AND EXTRA-STRONG

Whl-P-4O1l

PIPE A‘D PIPE FITTINGS:
IRON

WW-P-406

PIPE: STEEL AND FERROUS ALLOY (for)
ORDINARY USES (IRON-PIPE-SIZE)

WWw-P-).60

PIPE PITTINGS:
and 250 pound,

Yi¥-P-9Qla PIPE FITTINGS:

19-1

SOIL, CAST-

BRONZE (Screwed), 125CAST-IRON, DRAINAGE

Select target paragraph3