and such other descriptive data as may be required by
the Engineer.
No consideration will be given to partial
lists submitted from time to time. Approval of materials
will be based on manufacturers' published ratings. Any

materials, fixtures, and equipment listed which are not in
accordance with the specifications requirements may be

rejected.

16-15. MATERIAL SCHEDULES - OPTIONS OF THE GOVERNMENT:
the Contractor fails to submit for approval within the

If

specified time, a list of materials, fixtures, and equipment in acoordance with the preceding paragraph, the

Engineer will select a complete line of materials, fixtures.
and equipment.

The selection thus made by the Engineer

shall be final and binding, and the items shall be furnishec

by the Contractor without change in contract price or time
of completion,

16-16.

APPROVALS AND DRAWINGS:

Each manufacturer providing

unit substations, transformers, panelboards, switchboards,
intercommunication equipment, and other electrical equipmeni

for approval shall submit drawings showing the equipment in

its final form to the Engineer for approval.
All such
equipment thereafter delivered shall be in accord with prin*

of drawings as approved by the Engineer. The number cf priv
required shall be as designated in the General Conditions
of this specification.

16-17.

GUARANTEES:

All material furnished and installed

under this contract shall be new and free from all defects,

and shall be guaranteed for a period of one (1) year from

date of acceptance of the work.

Should any trouble develop

during this period, due to defective material or faulty
workmanship, this Contractor shall furnish all necessary

material and labor to correct the trouble without any cost

to the Government.

Any defective material or inferior woz.

manship noticed at the time of installation shall be corre.
immediately to the entire satisfaction of the Engineer.

Should the Government desi:
PRELIMINARY OPERATIONS:
16-18.
system or equipment be
the
of
portion
any
that
demand
and
and acceptance
completion
final
the
to
previously
operated

of the work,

this Contractor shall consent and such opera:

tion shall be under the supervision and direction of the
Engineer.
Any additional cost incurred by the demand for
preliminary operation of any part of the system or equipmen:

shall be submitted to the Engineer for approval.

If the

additional cost, if any, is warranted, this Contractor sha"
be paid by the Government as separate and distinct from any

16-4