the circumference of the pipe will rest firmly on
undisturbed soil.
d.
Excavations for prefabricated sheet metal
manholes shall be sufficient to permit of proper installation, and for formed concrete work shall be as required
to suitably form the same.
e.
Depth of trenches shall be as required for
Slopes shown on the drawings or as directed by Engineer.
Unless otherwise directed the minimum distance from top

of pipe to finished grade shall be 2'-6".
f.

Except at locations where excavation of rock

is required, care shall be taken not to excavate below
Specified depths. Where rock is encountered during
excavating, the rock shall be removed to a minimum over-

depth of é inches below the required trench depths.
The
overdepth rock excavation and all excessive trench
excavation shall be backfilled with loose, moist sand,

thoroughly tamped to the satisfaction of the Engineer.
4-04,

BACKFILL:
a.

No backfilling of excavations shall proceed

until work therein has been inspected and approved by

the Engineer.

b. Backfill material shall be finely divided
material from excavations as approved by the Engineer,
Shall be free of debris and organic matter, and shall
be dampened to optimum moisture content.

Material for

backfilling up to a level of 1 foot above top of pipe
shall be free of rocks.
c.

Backfilling of trenches prior to testing of

pipe therein shall be the minimum required to maintain

position.
Pipe joints shall remain uncovered until testing is completed.
dad. Backfill for pipe installed or structure completed shall be placed alongside the pipe or structure in

layers not exceeding 6 inches in depth.

Backfill shall

be placed in a Symmetrical manner and care shall be taken
to prevent any wedging action or eccentric loading on or

against the pipe or structure.
permitted and may be required.

Water settling will be

e.
Surface finish shall conform to natural ground
contours aS approved by the Engineer.
Additional back-

4-2