The Contractor shall maintain at his

central office a complete and adequate staff for the
engineering and design of the project, together with
the necessary procurement, purchasing,

other special services required.
7.

expediting and

The Contractor shall prepare a Completion

Report for the Project within 90 days after completion
of test operations.

¢.

Construction Work:

The work to be performed

under this contract consists of furnishing all plant,

materials, equipment, supplies, labor and transportation,
including fuel, power, and water (except any materials,
equipment, utility or service, if any, specified herein

to be furnished by the Government), and performing all

work as required by Article III of the contract and all
modifications thereof in strict accordance with the

specifications, schedules and drawings, all of which

are made a part hereof,

and including Such detail draw-

ings as may be furnished from time to time during the
construction in explanation of said drawings.
The principal features of the work are as follows:
1.
Ground improvements, including roads,
area paving, airfields, earth stabilizing, surface
drainage, dust control and field work.

2.

P. 0. L. (Fuel) facilities.

3.

Fresh and salt water facilities and dis-

4,

Sanitary sewage systems.

5.

Electric generating and distribution systems.

6.

Communication systems.

7.

Control and signal systems.

8.

Piers, approaches and causeways.

9.

Scilentific structures and appurtenances.

tribution systems.

10,

Buildings and other structures and appur-

tenances other than scientific structures or military
structures,