PART II
SPECIAL CONDITIONS
SC-1 SCOPE OF THE WORK:
The work and services to be
performed under this contract, as set forth in Article
III of the contract, shall include the following:
a.

Reconnaissance, Study and Report of Project:

The Contractor shall make a preliminary field recon-

naissance and study of the Proving Ground site and shall
prepare a resultant report covering development plans,
utilities, structures, and comprehensive recommendations
for a definite construction program with a time schedule
and cost estimates coordinated with the program.
b.

Engineering, Design and Inspection:
1.

The Contractor shall make all necessary

topographical and other surveys

(except real estate or

boundary surveys) and maps and make or have caused to be

made all necessary subsurface investigations.
The Contractor shall prepare for the approval of the Commission
preliminary studies, sketches, layout plans, investigations, recommendations and reports; and estimate of cost
of proposed construction items and utilities and appurtenances thereto.

2.

After approval by the Commission of pre-

3.

The Contractor shall prepare cost and

liminary plans, sketches or drawings, the Contractor
shall prepare detailed working drawings and specifications
in accordance with Commission or Governmental standards.
material estimates based on the approved drawings and
specifications.

4.

he Contractor shall provide a Resident

Engineer and other necessary personnel to supervise and

inspect the construction work to see that all work is per-

Formed in accordance with the approved plans and specifica-

tions.

5.
The Contractor shall prepare record drawings to show construction as actually accomplished. These
drawings shall be prepared by revising construction drawings, or where drawings cannot be satisfactorily revised,
by preparation of new drawings.

sc-1

Select target paragraph3