with construction work to assure conformance with approved drawings and specifications. If approved, approval shall be indicated on each copy by appropriate stamp and date. Copies of all approved shop or working drawings shall be made available to the Contracting Officer. b. Fixtures and Equipment Data - On completion of the construction, the Contractor shall deliver to the Contracting Officer copies of manufacturers' catalog data covering all fixtures and mechanical equipment in- stalled in the buildings. The manufacturer's catalog data shall include full identification of the equipment or fixture, capacities, current characteristics, dimenSions, and identification of replacement parts. Operating instructions for installed equipment shall be furnished and conspicuously mounted by the Contractor at places designated by the Contracting Officer. ce. Samples - If the Contracting Officer re- quires that the Contractor submit for prior approval samples of materials proposed for use in the work coverai by the contract, the Contractor shall make no commitments for such materials until the submitted samples has been approved by the Contracting Officer. ad. Standard Stock Articles - All materials, Supplies and articles furnf{shed shall, wherever practicable, be standard products of recognized, reputable manu-facturers. Any changes required in the details and dimenSions indicated on the drawings, for the substitution of Standard products other than those provided for, shall be properly made as approved by the Contracting Officer. e. Standard Tests, Qualities and Guarantees: (1) All materials, supplies and parts and assemblies thereof entering into the work to be done under these specifications shall be tested as specified herein, or, if not specified, in conformity with Article III of the contract and according to the best modern approved method for the particular type and class of work. (2) Unless otherwise authorized or directed, where standard published specifications of recognized authorities or organizations are specified, the latest revisions of such specifications current at the time the work is executed shall govern. Gc-8