‘GC-IITI

ACCOMPLISHMENT OF WORK - CONSTRUCTION

III-1 CHARACTER OF WORK AND MECHANICS - This work shall
be executed In the best and most workmaniike manner by
qualified,

careful and efficient mechanics in strict accord-

ance with the drawings and specifications.
III-2

BASE LINES AND GRADES - The Contractor shall

make all necessary fleld surveys required to adapt con-

struction to terrain conditions; furnish all grades which

are essential to the construction of the various items,

and stake out the base lines of all items of construction
at the construction site.
The Contractor shall furnish
all stakes, templates, platforms, equipment, ranges and
labor that may be required in setting and cutting, or
laying out any part of the work.
The Contractor will be
held responsible for the proper execution of work to such
lines and grades, and all stakes or other marks shall be
preserved by him until their removal is authorized by the
Contracting Officer.
III-3 DRAWINGS AND SPECIFICATIONS - Where no figures
or memoranda are given, the drawings shall be accurately
followed according to scale.

In any case of discrepancy

in the figures on the drawings, the matter shall be inmmediately submitted to the Contracting Officer without
whose decision said discrepancy shall not be adjusted by
the Contractor, save only at his risk; and in the settlement of any complications arising from such adjustment,
the Contractor shall bear all expense involved.
In case
of differences between the drawings and specifications, the
specifications shall govern. Where specifications or
standards of the Federal Government, technical societies
or testing organizations are included in these specifications by reference the latest revision to such specifications or standards shall govern.
III-4 INSPECTION - AS set forth in Article III of
the contract, the work shall be conducted under the general directions of a responsible representative of the
Contractor and is subject to inspection by his appointed
inspectors to insure strict compliance with the terms of

the contract, and with the provisions of the drawings and
specifications as approved by the Commission. No inspector is authorized to change any provision of the drawings or specifications without authorization of the Com-

mission, or its authorized representative, nor shall the

presence or absence of an inspector relieve the Contractor

from any requirements of the contract.

Gc-4