28-83 Stations Nos. 511, 512, 513, 5142, 5141, 5151, 5152, 5161, 5162, 5163, Location E Stations No. 5171 thru 5174, 518, 5182, Location 8. 28-84 28-85 28-86 28-87 28-88 Stations Nos. 519, 5192, Location W Station No. 59la and 591b, Locations C&E Stations No. 5934, b, Locations C & E c, and ad, Stations Nos. 6101 thru 6104, Location E,. Location T Station No. 623, Location S Stations Nos. 625 and 626a, Location T Station No. 771, Location E Station No. 772, Location V 28-90 28-91 Station No. 775, Location A 28-94 28-50 Station No. 6105, Location $ 28-50 Stations Nos. 623b and 624b, Location 9. Stations Nos. 625b, c, and 626b, c, 28-89 28-92 28-93 28-49 28-49 Station No. 773, Location C Stations 821, Site E Station 822, Site S Station 823, Site Q Station 824, Site P Station No. 825, Location E Station No. 826, Location 8 Stations #827, Location Q Station #828, Location P SECTION 29 STEEL TOWERS 29-01 29-02 29-03 29-04 29-05 Scope Requirements 75 Ft. Steel Tower Foundation 200 Ft, 300 Ft, Steel Tower Foundation Steel Tower Foundation SECTION 30 MISCELLANEOUS EQUIPMENT AND FURNISHINGS 30-01 30-02 30-03 30-04 30-1 30-1 30-1 30-1 Scope Protection of Work Assembly Locations -q-