26-03 26-04 26-05 26-06 26-07 26-08 26-09 26-1 26-2 26-2 Connections Assembly Roughing-In Leveling Locations Equipment Test of Completed Systems SECTION 27 ASPHALTIC CONCRETE PAVING & EMULSIFIED ASPHALT DUST PALLIATIVE 27-01 27-02 27-03 27-04 Locations The Work of this Section Asphaltic Concrete Pavement Emulsified Asphalt Dust Palliative SECTION 28 SCIENTIFIC STRUCTURES 28-01 General Requirements 28-03 28-04 Station Nos. 3, 4, & Station No. 6 (Bldgs. 460 and #6b), 28-05 Station No. 7, 28-02 28-06 28-07 28-08 28-09 28-10 28-11 Station No. 2, Location C, E, E+ and V Locéttions C, D, E, & E+ Location N, P&M Station No. 8 and 9, Location E & V Station No. 8+ and 94, Location Et Station No. 18, Locations C, D, E and E+ Stations No. 20 and 21, Locations E and C. Stations 22 and 24, Locations C, V, E & Et Stations 23a (Existing), Locations C, D, E 23b (new), Location E 28-12 Station No. 25, 28-14 28-15 Station No. 27, Location © and E 28-16 Stations 30a, 28-13 Location E Stations 26a, 265, Location E, Station 26c, Location C Station No. 28, Locations C,D, & E Station No. 29, Location E 30b, tions E, 0, & V and 30c, Loca- 28-1 28-1 28-1 28-2 28-3 28-4 28-4 28-5 28-6 28-6 28-6 28-7 28-7 28-8 28-8 28-8