its ow orgnic mission, but also with tho instellecicn, mointcnanes,
and operation of most of Headquarturs JTF SEVEN communication fecilie
tics and certain support of each of the other four Task Groups,
. Serious problems were encountered during the accomplishment
of the missicns cnumcrzted hercin,

The most sericus was the delay .

in engineer construction, egpecially the modification of Building 15,
This work was startsd Late and All phases of signal activity were

seriously hanpcrca because of this one problem,

Incrder to accomplish

this tisk it ws noccssary for CTG 7.2 to taic action daily to cx.
pedite signal construction and to naintein the priorities, as all
sections had Ancroasingly urgent requircnents. It was also necessary
for signal personnel to check enginosring blueprints for acquracy ord

nir conditioning and power load studies,

This saved time from

an overall viewpoint, but at. the’ expense of sigral activities,

.

Finally, it was decided to fastall equipmcat, activate new cireuits, |
train personnel, and tet the ongincer construction take place con-

currontly.

This was ncconplistedin spite of noise, dirt

¢cxrddd conditions.

and

a o.ne

"A sindler problem areCG with respect to the installation ef
the died telephone exchanges A work detail fran TG 242 Engineers
hlanted Aca’“Lo tuet in thy eonerotes; ecntrscter porscnel tore lev

walls and installed power cables; dial instellaticn personnel instelled
delicate equipment; signal personnel continued| Sporatén ‘of the conn)
exchange; endet rtain equipment not recstved was feoricated Locally.
— Ane ther problon was the statue of atgnal supply The results

oto.

ee a

Heap

Task Grorp 7,2 was faced, not only with the fulfilling of

re eet Me me em eetnw

Ve

Select target paragraph3