1.

Missicn:
During the garrison phase prior to build-up, the general

é

hen

‘SECTION XIII = COMUNICATIONS:

. mission of CTG 7,2 with respect to ccmmunications, was to establish
signal ccmmunicetions, supply, sturage, and repair facilitics required
by. the Forward Area Garrison Force during tho interim-cpcrational
period,

Includod in CJTF 132 Operation Order 4-52, which assignod
this mission, was a detailed list of tasks for tha 2ecomplishzent of
this missioee

,

It should be pointed cut that a general mission which began’
at this tine and ccntinucd throughout the entire length of time

ver-

ed by this report was planning for Operation CASTLE. “7

Upon receipt of CJTF SEVEN Operati:n Order 1-53, CIG 7.2 publishod his Operation Order 1-53 dated 13 October 1953 whi ch prescribed
the communications missicns during the build-up phase -for CaSTLE,
The gencral missions assigned for the build-up Were?

Ge

,

Install, operate, and naintein consunications facilities

as directed by CJTF SEVEN.
b,

Establish.a “transmissiin security training erograa for

all intended users of voice radio fa cilities and a message draftor
inprovement progran tsa
nest effictent use of Limited operational
conmuntcatiicns facilits OS.

- A

CTG 72 Operetion Order No. 1-53 set f, rth aList at tasks
which wero necessary to accomplish the missions stated in the precod=

46

ing paragmph.
L5-Tab LL
L6-Tab LM

Select target paragraph3