7

FROJECT
STARTED

COMFL

3 May

100%

130.Hot Water Reaters Electrical end
Water Heaters

8 Apr

bop

131. Swinners Tavern
Fetio

Aggregate

1 Mar

100%

15 Mer

132. Plidg 90

Motal sheeting

13 Fed

100%

6 Mar

133. Radar Towor

Lumber

28 Mar

100%

3 Apr

134. Aircraft Hangar

Window Glass

15 Feb

100%

15 Mar

135- Fost Motor Fool

Ventilators
Elec Fower

ERCS:CT NUMBER
129. Mess Hall

Bldg 93

ze

3

Faint

roofing

REx

REATKS
AEC rrovidod material:
Arzy labor.
Rot weter heaters rocoived froa
ZI by ESN 29 Juno 53.

75%

Ventilators have been installed.
Installation of olectrical work for
explosive rroff lignting io progress.

136. Electric Fower,

15 Feb

100%

5 Mer

137- Demolish Bldg #133

20 Jap

100%

5 Mar

138. Gorerators

5 ver

96%

139. Ropair LCi $48

16 Mar

100%

18 Mer

140. Wire fence transformer

5 Mar

100%

7? Mar

141. AF Coofurence Room

13 Apr

100%

24 Apr

FRawivoesonde Aroe-

14

ASC provided raterials
Aray lebor.

Work io pregress %0 lest unit.

Select target paragraph3