si Miekeaan’Caecaneaeoeeeed 2STaeCrea Ta Reena ETiia tenaRLaeney

fo

o

FROJECT NUMBER
i
|

RiearenMl eeeeens

MAJOR ITEMS REQUIRED

a

FROJECT
&
STARTED COMPL COMP REMARKS

58. Main Fier Cargo Lumber, paint

CTG 7.2 requested AEC to stadilize

Area

area iv conjunction with their

project ¢80.

;

Security locker

will bo constructed when surfacing
complete.

,

59- Frosh Water Well Lumber, paint

11 Feb

100%

28 Feb

60.

Main Ammo Dump

13 Apr

100%

19 May

61.

Basketball Court Concrete, paint

15 Nov

1008

7 Fed

62.

Gun Fositiongs

26 Jus

100%

29 Juve

Lumber, paint, Barbed

wire, Corrugatod Ireno

“Sand bags, lumber

No fixed position to be installed;
tovtative positions t% bo marked

for alert practice purnosos.

63-

Telopaove Calde

Cable

64.

Thoater .

Paint

20 Feb

100%

25 Fod

65-

Beach Chaire

Lumber, paint

27 Apr

1004

20 May

66+

Frogram Control

Book

3 Feo

100%:

1 July

3 Fob

100%

12 June

04

67. Pictorial Record
ECTION If —-

.

Al

Awaitiog rlao for vew telephove

system from Hq JTF -— Ref. new. dial
sy sten

_100 beach cheires built and distributed

(Total of 10°F aTee 100% complotoa)
68.

Dobris & Rubble

Streot Sewor

H*tN Bulldozor

9 Feb
a

10068

15 Apr

Select target paragraph3