1952 EXPANSION AND ADJUSTMENT

Reproduced from the-holdings of the National Archives
Pacific Southwest Region

Requirements for Operation Ivy resulted in the expansion of the

scheme to include the entire Atoll.

Some stations of the earlier

surveys had been destroyed and additional stations were required.

Fifteen stations were established, replaced or more precise values
determined.

AS the expansion permitted dosing the survey around

the Atoll to the Runit base line a check on tne previous work was
obtained.

The closing error of the survey before adjustment was

determined a8 approximately 1:25000.

An additional cheok was

obtained by inclusion of the zero line traverse in the Flora-Gene
area.

This indicated a closing error of approximately 1:70000

before ad justment of the adjacent quadrangle.

In order that the

values of a station would remain the same independent of the direction of computation through the net an adjustment has been

applied to the triangulation figures.

This consists of a side

equation adjustment which resulted in slight changes in the values
previously reported but of little consequence in computations made

to date.

|

PLANE COORDINATE SYSTEM (IVY GRID)
A plane coordinate system has been established which is common to
all stations.

MThe origin of coordinates is a plane

through tri-

angulation Station Coral with assumed values of N 100,000.
100,000, at this station.
used as

East

A true meridian through this station was

the basis of bearings and was determined by computing through

the base expansion figure from the adopted azimuth of the Runit base
line.

Tne horizontal

control network

-3-

as

it now exists should meet