STANDARD OPERATING INSTRUCTIONS NO. 2
MAINTENANCE AND OPERATION INSTRUCTIONS FOR
POL FACILITIES PARRY ISLAND
where the entrained air is separated and vented to the atmosphere,

The gasoline then leaves the deaerator and passes

through meter M2, pressure regulator valve V64, valves V66,
V68 and V69 to the main gasoline loading header, and is
delivered to the tank loading header through valve V116 and
liquid level control valve L2 and thence through valves V70,

V71, V72 and V73 into tanks 6 through 9.

The gasoline is

delivered also to tank No. 307 through valves V84 and ves fren
the main gasoline header.
During the loading operation, valve V114 is open and V55
closed until the excess salt water has been drained from the
submarine line; then V114 is closed and valve V55 is opened
allowing the gasoline to pass into the system.

Valves V54 and

V109 are closed during this operation.
A line is connected across the main unloading header and
the vent on tank No. 7 through the float chamber of liquid
level control valve L2,

This line is provided with two block

valves, V86 and V87, for cutting the float chamber off the
system.

GASOLINE UNLOADING OPERATION

7.

The gasoline is unloaded from tanks 6 through 9 to the main
gasoline unloading header through vavles V78, V79, V80 and

V81 and from tank 307 through valves V83 and V85.

Thence it

Select target paragraph3