STANDARD OPERATING INSTRUCTIONS NO. 2 MAINTENANCE AND OPERATION INSTRUCTIONS FOR POL FACILITIES PARRY ISLAND GENERAL 1. This operating standard outlines the procedure to be followed in maintaining and operating the POL facilities and the tank farm on Parry Island. The same general instructions cover the POL facilities at Eniwetok Island. EQUIPMENT 2. Drawing FS 497 reproduced in this volume applies. 3. The equipment installed at the POL tank farm and pump house is as follows: Pump House Equipment. (a) Four electric motor driven centrifugal pumps (P-1, P-2, P-3 and P-4) with allied pipe, valves and fittings, and pressure gauges needed to complete the installation. (b) Four dehydrators, (Dehydrators No. 1 and 2 for diesel oil dehydration, and Dehydrators No. 3 and 4 for gasoline dehydration) with the allied pipe, valves, fittings, gauges, meters, and pressure regulators needed to complete installation. (c) Two deaerators with allied equipment needed to complete the installation. Deaerator No. 1 is for diesel oil and No. 2 is for gasoline.