considerable eyuinment. Of the buoys recovered fallout data were
obtained from only 20 on Shots 1 and 2,
vata were obtained on the currents in the vicinity of the two
atolls. These data alone with similar data from IVY are included in
. ppendix H,
2363-1

shot

The array planned for the first shot is shown in Figs. 2.5 and

2.6, This was considered to be a reasonable effort based upon rehearsal
experience, Heavy seas prevented plac.ment of all except the portion
shown in Fi;. £.0. This attempt to sample the fallout was unsuccessful
beeause the pri:ary fullout occurred in another sector. This failure
indicated the importance of huving a 360° array around ground zero.
Rededee

Shot 2

The originz1 plan for shot 2 called for a complete 360° array

sinilur to thet planned for Shot 1. A portion cf this plan was executed
tvice tut in ezch case the shot was deferred for un indefinite period.
The buoys placed cn these cecasions vere lest. «an alternate clan which
re.juir:d less time to implement was dev>loped for use in case notice of
the siiot date was given too near shot time to permit laying the -riginal

urray.

This ulternu.te plen was used for Uhot 2.

Pededed

See Fig. 2.7.

cChot 4

The buoy urray and cetuils of the operation plan for Shot 4
nme given in Appendix a. This plun was successfully carried out on the
basis of a firm schedule for the fourth test. However the effort was

nullificd by a very lat: deferment of the shot.
here r ccvered,

Cnly 7 of the 26 buoys

when the shot finally did occur no buoys were in the

orlinury fLllout zone,

Keledek

thot 5

Buovs were lid in two separate attempts to d cument fallout
on Shot §, The first array vas cinilar to that employed for Shot 2
(Fig. 2.7). The cecond was intended to aument the first follovin, a
ei-hr dela; of the test. Further deferment . ullified this effort, also.
Participation by projcct personnel in the water samplin.: procrum was
effected lor Shots 5 and 6,

elcewhere,.
230305

wtesults of this field work huve been reported

Shot 6

our buoys were planted from the chips assimned to Project 6.4,
covceneing i-hr prior to the shot. il:avy seas prevented recovery of any
units.

31

Select target paragraph3