ye gs? Here is a 25 Sept. memo from Sudgen to Reeves on this same meeting which - PR may have been 20 Sept., and at which H&N was given guidance on preparation of this study for opening the EPG. LASL presented a short term program and "has ordered bomb cases and will prepare these shots for air drop over the Eniwetok lagoon." LASL desires fireball diagnostics, radio chemistry, and other photo diagnostics on these tests and feel they could have the devices ready in 2 months. H&N feels that they might be ready to support in 60 days and this would entail "reopening Parry Island and laying a target area in the northwest lagoon." Livermore's quickest program would be to have 2 barge shots, There are 5 cargo barges currently on hand at EPG which could be utilized as shot barges and Livermore estimates they could be ready to fire in 90 days but H&N felt it would require at least 5 months to prepare for such shots. Both labs discussed a more relaxed approach feeling that LASL could easily do the 2 air drops in 6 months and Livermore the barge shots in 8 months. Next discussed was a longer range more extensive atmospheric program wherein both labs would desire to do 14-16 tests and the DOD about 5 shots at Eniwetok and 5 missile shots from J.I. Sandia discussed :