CHAPTER Il
SECTION 2
5.

4'x 4' posts were placed at double doors

6.

Exterior struts were provided

VOL.
BOOK 6

Bldg. 323 - Rad-Safe:
1.

Doors were locked in closed position

2.

End walls were braced

3.

Roof support was provided

4.

Cable bracing was provided

5. Additional securing studs were driven in wall sill plate angles
Bldg. 342 - Shop;
1,

End walls were braced

2.

Roof support was provided

3.

A post was provided under the frame under the sliding door

4. Additional securing studs were driven in wall sill plate angles
5.

Building was braced on the blast side only

Bldg. 406 - Boat Repair-Storage:
All doors and shutters were locked in open position
Posts were provided under frames of sliding doors
330 and 344 - Laboratories:

Cable bracing was provided
The Using Agency braced instrument panels and covered equipment
with tarpaulins

Bldg. 339 - CMR Power Plant:
1, Additional Butler frame was put in each bay
2.

6-36

Vertical support for roof was provided