QUAN, UNIT

TOTAL
COST

II

AS LISTED BELOW (Continued)

“TIOA

Ogt-L

DESCRIPTION OF PROPERTY UNITS

STATION NOS. 1000.01 THRU 1000.10 (Continued)
Telephone and signal terminal cabinet installed
house Building.

in existing Green-~

Location:
Station No, 1000.01
Station No. 1000.02

Station No. 1000.09

Alice
Belle

Mary

3

Bach

Installed equipment (Station No. 1000.04): 1 - KW "U.S." portable
generator, serial No. 117176, H & N No. G-99.
Installed equipment (Station No. 1000.08): 1 - 3 KW "Anderson-O'Brien'
portable generator, serial No, 282, H & N No. G-89.
(The above lists do not contain any user-furnished or user-installed

equipment. )

Construction Contract Cost

Engineering Cost

31,632.92

279.18

31,912.10

STATION NOS. 1001.01 THRU 1001.03

Locations:
Station No. 1001.01
Station No. 1001.02
Station No. 1001.03

Janet
Ursula Yvonne

3

Each

XIGNAddV

Telephone and signal terminal cabinets installed in existing Greenhouse Station 69.