QUAN, UNIT TOTAL COST II AS LISTED BELOW (Continued) “TIOA Ogt-L DESCRIPTION OF PROPERTY UNITS STATION NOS. 1000.01 THRU 1000.10 (Continued) Telephone and signal terminal cabinet installed house Building. in existing Green-~ Location: Station No, 1000.01 Station No. 1000.02 Station No. 1000.09 Alice Belle Mary 3 Bach Installed equipment (Station No. 1000.04): 1 - KW "U.S." portable generator, serial No. 117176, H & N No. G-99. Installed equipment (Station No. 1000.08): 1 - 3 KW "Anderson-O'Brien' portable generator, serial No, 282, H & N No. G-89. (The above lists do not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost 31,632.92 279.18 31,912.10 STATION NOS. 1001.01 THRU 1001.03 Locations: Station No. 1001.01 Station No. 1001.02 Station No. 1001.03 Janet Ursula Yvonne 3 Each XIGNAddV Telephone and signal terminal cabinets installed in existing Greenhouse Station 69.