TOTAL
COST

IT

FLORA (Continued)

“TOA

Q@ST-L

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

STATION NO, 842 (Continued)
four individual concrete piers; contains a box for a telephone installation.

Bach

(No installed equipment. )

Construction Contract Cost

Engineering Cost

7,665.23
550 47

8,215.70

SUB-STATION NO. 842

Sub-station No. 842, adjoining and serving Station 842, consists of

one 15 KVA transformer, and necessary primary fuse cutouts, safety
switches, wiring, conduits, and fittings, with unistrut framing

supports, erected on a reinforced concrete slab 3'-6" wide x 8'-6"
long, and surrounded by 54 lineal feet of chain link and barbed wire

fence with pipe posts and hinged gate.

Installed equipment:

Bach

1 - 15 KVA "Gregory" transformer, serial No.

(none), H & N No. TR-150.
(The above list does not contain any user-furnished or user-installed
equipment. )
Allocated to all Stations

STATION NO, 910
A wood framed platform 9'-10" wide x 19'-4" long, decked with 2"
planking, at 15'-7" above grade, supported by four 4" x 6" timber

XIQGNGUddV

ELMER

Select target paragraph3