TOTAL COST IT FLORA (Continued) “TOA Q@ST-L QUAN. UNIT DESCRIPTION OF PROPERTY UNITS STATION NO, 842 (Continued) four individual concrete piers; contains a box for a telephone installation. Bach (No installed equipment. ) Construction Contract Cost Engineering Cost 7,665.23 550 47 8,215.70 SUB-STATION NO. 842 Sub-station No. 842, adjoining and serving Station 842, consists of one 15 KVA transformer, and necessary primary fuse cutouts, safety switches, wiring, conduits, and fittings, with unistrut framing supports, erected on a reinforced concrete slab 3'-6" wide x 8'-6" long, and surrounded by 54 lineal feet of chain link and barbed wire fence with pipe posts and hinged gate. Installed equipment: Bach 1 - 15 KVA "Gregory" transformer, serial No. (none), H & N No. TR-150. (The above list does not contain any user-furnished or user-installed equipment. ) Allocated to all Stations STATION NO, 910 A wood framed platform 9'-10" wide x 19'-4" long, decked with 2" planking, at 15'-7" above grade, supported by four 4" x 6" timber XIQGNGUddV ELMER