TOTAL COST II QUAN. UNIT “TOA DESCRIPTION OF PROPERTY UNITS ELMER STATION NO. 805 Two 3/16" checkered floor plate platforms in tower shaft of Station No, 301; one platform at 100' level and one platform at 112'-6" level; the area between these levels is enclosed with 1/2" exterior plywood; complete with electrical wiring and fixtures. Each E.C.0. 3702 (paragraph 2) authorizes the addition of a transformer to feed a portion of Station No. 805. Installed equipment: 1 - 15 KVA, single phase transformer. (The above list does not contain any user-furnished or user-installed equipment. ) Included with Station No. 301 - Elmer MACK STATION NO. 806 A wood frame building 9'-O" square x 8*-6" high with composition shed roof, plywood floor and exterior sheating over 2" x 6" studs, erected on an existing wood platform, area 81 square feet, volume 689 cubic feet. 6ST L Construction Contract Cost Engineering Cost 2,649.77 89.11 2,738.88 XIGN@ddv Bach (No installed equipment. )