UNIT

TOTAL
COST

II

AS LISTED BELOW (Continued)

“TOA

2St-L

QUAN.

DESCRIPTION OF PROPERTY UNITS

STATION NOS. 800 THRU 803 (Continued)
Station 800 and 801

Station 802 and 803

Janet - 2

Tilda - 2

i Units

Locations:

Station Nos. 800 and 801

Station Nos. 802 and 803

Janet

Tilda

Bach

Installed equipment (Station 800): 2 "Kilpatrick" evaporator dehumidification units, serial Nos. 102750.15, 81450-4, H & N No. A-116,
A-81-A; 2 "Kilpatrick" condensor dehumidification units, serial Nos.
81450-11, 81450-2, H & N Nos. A-88-B, A-78-B.

Installed equipment (Station 801):

2 "Kilpatrick" condensor dehum-

idification unit, serial No. 81450-9, 81450-4, H & N No. 4-90-B, A-

®6-B; 2 "Kilpatrick" evaporator dehumidification units, serial Nos.

102750.15, 102750.22, H & N Nos. A-115-B, A-110-B.

Installed equipment (Station 803): 2 "Kilpatrick" complete dehumidification units, serial Nos. 71152-4-B and 71152-3-A, 71152-1-A and

71152-2-B, H & N Nos. A-173-A & B, A-174-A & B.

(The above lists do not contain any user-furnished or user-installed

equipment. )

Construction Contract Cost

Engineering Cost

74,244.01

686.53

74 £930.54

XIGNGddvV

Installed equipment (Station 802): 2 "Kilpatrick" condensor dehumidification units, serial Nos. 102750.16, 81450.13, H & N Nos. A-108A, A-80-B; 2 "Kilpatrick" evaporator dehumidification units, serial
Nos. 81450-4, 102750.21, H & N Nos. A-88-A, A-114-B.