UNIT TOTAL COST II AS LISTED BELOW (Continued) “TOA 2St-L QUAN. DESCRIPTION OF PROPERTY UNITS STATION NOS. 800 THRU 803 (Continued) Station 800 and 801 Station 802 and 803 Janet - 2 Tilda - 2 i Units Locations: Station Nos. 800 and 801 Station Nos. 802 and 803 Janet Tilda Bach Installed equipment (Station 800): 2 "Kilpatrick" evaporator dehumidification units, serial Nos. 102750.15, 81450-4, H & N No. A-116, A-81-A; 2 "Kilpatrick" condensor dehumidification units, serial Nos. 81450-11, 81450-2, H & N Nos. A-88-B, A-78-B. Installed equipment (Station 801): 2 "Kilpatrick" condensor dehum- idification unit, serial No. 81450-9, 81450-4, H & N No. 4-90-B, A- ®6-B; 2 "Kilpatrick" evaporator dehumidification units, serial Nos. 102750.15, 102750.22, H & N Nos. A-115-B, A-110-B. Installed equipment (Station 803): 2 "Kilpatrick" complete dehumidification units, serial Nos. 71152-4-B and 71152-3-A, 71152-1-A and 71152-2-B, H & N Nos. A-173-A & B, A-174-A & B. (The above lists do not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost 74,244.01 686.53 74 £930.54 XIGNGddvV Installed equipment (Station 802): 2 "Kilpatrick" condensor dehumidification units, serial Nos. 102750.16, 81450.13, H & N Nos. A-108A, A-80-B; 2 "Kilpatrick" evaporator dehumidification units, serial Nos. 81450-4, 102750.21, H & N Nos. A-88-A, A-114-B.