TOTAL
COST

II

QUAN. UNIT

“TOA

DESCRIPTION OF PROPERTY UNITS
AS LISTED BELOW

STATION NOS. 690.01 THRU 690.04
A rectangslar shaped reinforced concrete structure 7'-4" x 3'-h" x
3%-]0'-1/2" highs; 10" thick floor slab; exterior and division walls

of varing thickness for two compartments; the larger compartment, un-

roofed, has an 18" 0.D. spiral weld pipe 14'-0" long buried vertical).

into the ground and collared by the floor slab.
This pipe has a
water tight concrete seal at the bottom, a water tight steel cover

and two connecting 2" standard pipes capped above floor level; the

smaller, heavy walled compartment is closed at top by a rectangular

steel plate.

Two 2" diameter steel rods are cast into and extend 4'‘-

6" above the concrete. Two 4" "I" beams are cast into and extend
horizontally 3'-O" beyond the concrete.
Locations:

Station No. 690.01

Station No. 690.02
Station No. 690.03

Janet

Lucy
Mary

Station No. 690.04 Sally

Bach

(No installed equipment. )

Construction Contract Cost
Engineering Cost

17,924.70
479 .00

18,403.70

Reactivation of existing concrete structure 300 square feet roofed

area, 294 square feet of unroofed area; and a roofed volume of 22k?

TST-L

cubic feet.
Reactivation includes installations of two dry condenser
units and two air conditioner units, piping, wiring and connections;
also contains protective earth fill over and around the structure.

XIGNaAddV

STATION NOS. 800 THRU 803