QUAN.

UNIT

TOTAL
COST

TI

JANET (Continued)

“TIOA

DESCRIPTION OF PROPERTY UNITS

STATION NOS. 623.01 THRU 623.10 (Continued)
a ?'-O" radius circle of bolts.

LO

(No installed equipment. )

Construction Contnact Cost
Engineering Cost.

Each

30,541.24
335.53

30,876.77

AS LISTED BELOW

STATION NOS. 630.01 THRU 630.04
Three 2" pipe standards, 6'-0O" high, with steel plate leading fins

welded thereto, and cable guyed,to two steel beams embedded in and
extending from a concrete base 7'-6" wide x 8'-9" long x 3'-0" deep.

The base is formed to contain a 2'-0O" cube battery box with gasketed
steel cover and connecting conduits. Thru the concrete base a 2k"

diameter steel pipe extends 17'-0" into the ground with a seal plate
provided at the bottom.
Locations:

Station No. 630.01

Janet

Station No. 630.03

Mary

Station No. 630.04

(No installed equipment. )

Lucy

Tilda

Construction Contract Cost

Lat-L

Engineering Cost

y
17,487.11

388 .68

Each

17, 875.79

XIGNaGddv

Station No. 630.02

Select target paragraph3