QUAN. UNIT TOTAL COST TI JANET (Continued) “TIOA DESCRIPTION OF PROPERTY UNITS STATION NOS. 623.01 THRU 623.10 (Continued) a ?'-O" radius circle of bolts. LO (No installed equipment. ) Construction Contnact Cost Engineering Cost. Each 30,541.24 335.53 30,876.77 AS LISTED BELOW STATION NOS. 630.01 THRU 630.04 Three 2" pipe standards, 6'-0O" high, with steel plate leading fins welded thereto, and cable guyed,to two steel beams embedded in and extending from a concrete base 7'-6" wide x 8'-9" long x 3'-0" deep. The base is formed to contain a 2'-0O" cube battery box with gasketed steel cover and connecting conduits. Thru the concrete base a 2k" diameter steel pipe extends 17'-0" into the ground with a seal plate provided at the bottom. Locations: Station No. 630.01 Janet Station No. 630.03 Mary Station No. 630.04 (No installed equipment. ) Lucy Tilda Construction Contract Cost Lat-L Engineering Cost y 17,487.11 388 .68 Each 17, 875.79 XIGNaGddv Station No. 630.02