QUAN.}

UNIT

TOTAL
COST

II

AS LISTED BELOW (Continued)

"TIOA

Oyt-L

DESCRIPTION OF PROPERTY UNITS

STATION NOS. 621.01 THRU 621.06 AND 621.10 THRU 621.15
A wood framed and decked raft, 12'-0" x 12'-0", with 8 oil drum

floats and an angle iron stanchion and obstruction light, moored in

the iagoon with an ofl drum mooring bucy attached by 1/2" wire rope
to a 4°’-O" cube concrete anchor.
Locations:

14 in Lagoon
1 at Mack

12

{No installed equipment. )
Construction Contract Cost

Engineering Cost

Each

23,525.87

553-64

24 079.51

ELMER

STATION NO. 622
This ts a locaticn stake set .a the ground, requiring detailed
engineer services.

(No installed equipment. )

Construction Contract Cost,

660 .00

1

Bach
660 GO

STATION NOS. 623.01 THRU 623.10
A reinforced concrete base 12'-O" square x 4'-0" thick provided with

XIGNaAddV

JANET

Select target paragraph3