QUAN.} UNIT TOTAL COST II AS LISTED BELOW (Continued) "TIOA Oyt-L DESCRIPTION OF PROPERTY UNITS STATION NOS. 621.01 THRU 621.06 AND 621.10 THRU 621.15 A wood framed and decked raft, 12'-0" x 12'-0", with 8 oil drum floats and an angle iron stanchion and obstruction light, moored in the iagoon with an ofl drum mooring bucy attached by 1/2" wire rope to a 4°’-O" cube concrete anchor. Locations: 14 in Lagoon 1 at Mack 12 {No installed equipment. ) Construction Contract Cost Engineering Cost Each 23,525.87 553-64 24 079.51 ELMER STATION NO. 622 This ts a locaticn stake set .a the ground, requiring detailed engineer services. (No installed equipment. ) Construction Contract Cost, 660 .00 1 Bach 660 GO STATION NOS. 623.01 THRU 623.10 A reinforced concrete base 12'-O" square x 4'-0" thick provided with XIGNaAddV JANET