| UNIT TOTAL COST . II QUAN. "TIOA ontL : DESCRIPTION OF PROPERTY UNITS AS LISTED BELOW (Continued) STATION NOS. 615.01 AND 615.02 (Continued) Locations: Station No. 615.01 Station No. 615.02 (No installed equipment. ) Helen Irene Construction Contract Cost Engineering Cost 2 Each 1,654.49 70.69 1,725.18 STATION NOS. 616.01 AND 616.02 A triangular shaped reinforced concrete ramp, 2'-O" in width, sloping from finish grade to 4'-0" sbove finish grade in 7°-Q", poured mono- lithically with a base slab 4'-0" wide x 2'-6" deep x 19'-O" long. There is one embedded conduit furnished by the User. Locations: Helen Irene Construction Contract Cost Engineering Cost 2 6,058.69 301.03 Each 6,359.72 XIQGNGUddV Station No. 616.01 Station No. 616.02 (No installed equipment. )