UNIT

TOTAL

COST .

II

QUAN.

"TIOA

ontL

:

DESCRIPTION OF PROPERTY UNITS

AS LISTED BELOW (Continued)

STATION NOS. 615.01 AND 615.02 (Continued)
Locations:

Station No. 615.01
Station No. 615.02
(No installed equipment. )

Helen
Irene

Construction Contract Cost
Engineering Cost

2

Each

1,654.49
70.69

1,725.18

STATION NOS. 616.01 AND 616.02
A triangular shaped reinforced concrete ramp, 2'-O" in width, sloping

from finish grade to 4'-0" sbove finish grade in 7°-Q", poured mono-

lithically with a base slab 4'-0" wide x 2'-6" deep x 19'-O" long.

There is one embedded conduit furnished by the User.
Locations:

Helen

Irene

Construction Contract Cost
Engineering Cost

2
6,058.69
301.03

Each

6,359.72
XIQGNGUddV

Station No. 616.01

Station No. 616.02
(No installed equipment. )