TOTAL COST II MARY (Continued) “TOA QUAN. UNIT DESCRIPTION OF PROPERTY UNITS STATION NO, 603 (Continued) 1°-O" thick partition; explosion proof doors; complete with electri- cal light and power wiring and fixtures, ventilating and power gen- erating equipment; total area 263 square feet; volume 2718 cubic feet. Bach Tastalled equipment: 1 - 75 KW "Caterpillar" portable generator, serial No. 4S-1247-SP, H & N No. G-13. (The above list does not contain any user-furnighed or user-installed equipment. ) Construction Contract Cost Engineering Cost 32,223.98 2,671.33 3h 895.31. SALLY STATION NO. 604 Consists of reactivation of Greenhouse Station 132a and 132b complete with electrical light and power wiring and fixtures, ventilating and power generating equipment. Bach Installed equipment: 1 - 50 KW "International-Harvey" portable generator, serial No. UDR-22998, H & N No. G-64. (The above list does not contain any user-furnished or user-installed Construction Contract Cost LEToL Engineering Cost 19, 303 .53 1,647 .87 20,951.40 XIGNGddvV equipment. )