TOTAL
COST

II

MARY (Continued)

“TOA

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

STATION NO, 603 (Continued)
1°-O" thick partition; explosion proof doors; complete with electri-

cal light and power wiring and fixtures, ventilating and power gen-

erating equipment; total area 263 square feet; volume 2718 cubic
feet.

Bach

Tastalled equipment: 1 - 75 KW "Caterpillar" portable generator,
serial No. 4S-1247-SP, H & N No. G-13.

(The above list does not contain any user-furnighed or user-installed

equipment. )

Construction Contract Cost
Engineering Cost

32,223.98
2,671.33

3h 895.31.

SALLY
STATION NO. 604
Consists of reactivation of Greenhouse Station 132a and 132b complete
with electrical light and power wiring and fixtures, ventilating and
power generating equipment.

Bach

Installed equipment: 1 - 50 KW "International-Harvey" portable generator, serial No. UDR-22998, H & N No. G-64.

(The above list does not contain any user-furnished or user-installed

Construction Contract Cost

LEToL

Engineering Cost

19, 303 .53

1,647 .87

20,951.40

XIGNGddvV

equipment. )